Which delivery method allows the use of any procurement options?

Get ready for the Project Delivery Exam with our comprehensive test, featuring detailed multiple-choice questions, insights, and explanations. Enhance your readiness and boost your confidence for the big day!

The design-build delivery method is recognized for its flexibility in procurement options. This method integrates both the design and construction phases, allowing for a cohesive team that can streamline decision-making and incorporate various procurement strategies. The collaborative nature of design-build enables the use of multiple procurement approaches, such as lump-sum contracts, cost-plus contracts, or even management contracts, depending on project needs and goals.

In contrast, other methods, such as design-bid-build, typically follow a more traditional process where the design is completed before the bidding phase, limiting the procurement options to competitive bidding. Negotiated contracts, while flexible in some respects, usually involve direct negotiations with a selected contractor rather than a wide array of procurement methods. Fixed-price contracts, on the other hand, define the project’s cost upfront, restricting the ability to adapt procurement strategies once the contract is signed. Thus, design-build stands out for its capability to incorporate any procurement option suited to the project context.

Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy